10 years to retrofit over 145 HV substations.
IEC 61850 Engineering and Training

Project start: 2019 (on-going)

Customer need: implementation of the secondary technology, including the IEC 61850 engineering and protection concept.

Challenges

This project implies the retrofit of a collossal number of AIS and GIS high-voltage (110kV) substations, which is one of the most ambitious projects Elvexys has ever undertaken.

Elvexys has been given a period of 10 years to carry out this project. Given the extent of the infrastructure to be retrofitted, it is a great challenge to lead all design, test and implentation phases in this time span.

Elvexys's services & solution

Development of protection functions and parameters for the standard feeders available in substations, including IED selection

Development of IEC 61850 templates, called "typicals"

IEC 61850 training and user support

­Redundant substation network engineering

Supply of simulators for protection functions validation

Tests with local integrator and final customer (FAT/SAT)

Supply of a documented system validation report

Maintenance and disturbance data engineering

Profits of Elvexys' solution

Optimization icon

Standardisation of IEC 61850 engineering concept

Cost reduction icon

Cost reduction

High performance icon

Fast and optimised IED and Gateway configuration

Infrastructure control icon

Advanced remote management and maintenance solution

Modular solution icon

State-of-the-art substation engineering according to customer requirements